August 2007 Before clearing the land |
September 2007 Clearing the land |
June 2008 Concrete |
|
(Left
Photo)- This is the concrete pad for the boys side of the
gym. The elevated dirt in the middle is where the actual gym
floor will be built. (Right Photo)- This is the concrete pad for the
girls side of the gym. The block walls are interior locker room
walls. the concrete pad in the back right hand corner, is where
the practice gym will be located.
|